A building is not one asset. A cost segregation study separates the carpet, cabinetry, specialty wiring, site paving and landscaping from the structure, so each is depreciated over the life it actually carries. Engineering-based, documented to the IRS Cost Segregation Audit Techniques Guide, and signed by a US CPA.
The components a study separates, a worked illustration on a $2 million building, the look-back study and the fixed fee.
Carpet and removable floor coverings, cabinetry and millwork, decorative lighting, dedicated electrical and plumbing for equipment, removable partitions, signage, appliances in rental units.
Paving, curbs and striping, sidewalks, site lighting, fencing and gates, landscaping and irrigation, retaining walls, site utilities.
Structure, foundation, roof, exterior walls and windows, and the systems that serve the building as a whole.
Allocated from the appraisal and the property record, and never used as a lever to enlarge the deduction.
| Example: $2 million building | Amount |
|---|---|
| Reclassified to 5-, 7- and 15-year property (25%) | $500,000 |
| First-year deduction with 100% bonus depreciation | $500,000 |
| First-year tax savings at a 37% rate | $185,000 |
An illustration of the arithmetic, not a representation about any return. The 100% bonus rate applies to qualifying property acquired after January 19, 2025; the 37% is an assumed rate. Studies typically reclassify 20% to 35% of depreciable basis, and the benefit depends on the owner’s ability to use the deduction.
A building bought this year, before the first depreciation schedule is written. The closing statement, appraisal and condition report are current, and the study arrives in time for the return.
A building bought in an earlier year. The missed depreciation is not lost: a change in accounting method on the current return brings it forward, with no amended returns.
A building built, expanded or improved, costed from the contractor’s own schedule of values, the strongest evidence a study can have.
| Depreciable building basis | Fixed fee |
|---|---|
| $500,000 to $1 million | $3,500 |
| $1 million to $3 million | $6,500 |
| $3 million to $7.5 million, including a local field inspection at cost | $10,000 |
| Above $7.5 million | Quoted |
| Look-back study, added for the method-change computation | $1,500 |
Fees as of October 11, 2026, quoted in writing for each engagement before anything is signed. No fee is contingent on the deduction: no share of it, no percentage of the tax saved, no success fee.